OUR COMMITMENT TO A GREEN WORLD: THE WASTE WATER TREATMENT PLANT

 

As required by environmental protection legislation, we collect in large underground tanks the first 5 mm of rain that falls on the yards and driveways inside our factory.
The water collected in this way, which according to the legislature could contain some pollutants, is pumped from underground tanks to the waste water treatment plant (biological and chemical-physical process) inside the factory.
The purified water is then reused in internal operating cycles and, if in excess, pumped into the public sewerage system through a drain that can be inspected by the public body to check its suitability for the prescribed discharge parameters.
With this further step we confirm our determination to be always on track with the technological innovation of our plants to protect the environment.


PHOTOGALLERY